Method Statements
As Consulting Engineers the practice was formed to provide advice and to consult with other professional Engineers, Architects and Contractors
Our aim as Smart Crosby International is to be a positive addition to any Design Team when undertaking the engineering analysis and detailed design of all elements of the structure from foundation to external façade.
The Company Directors and principal staff members have considerable experience within the Construction Industry together with the relevant professional qualifications.
By providing façade consultancy in traditional materials including brick, stone, terracotta, pre-cast concrete together with lightweight composites such as glass fibre reinforced, concrete (GRC), polyester (GRP) and gypsum (GRG) Smart Crosby International are able to offer a comprehensive façade engineering service and provide an extensive range of in-house services which include structural analysis and façade performance, development of complex geometric forms, 3D modelling together with detailed designs and performance specifications all of which will be fully co-ordinated with other materials utilised in the design of the building façade.